Skip to content
HVACloud

Appearance

Language

Interfaces you do not have to wait for

Two ways into the same platform: the online designer without programming, HVACStudio as a development environment. Both produce the same artefact.

  • White label standard, not a surcharge
  • One artefact designer and studio write the same format
  • Over the air changes reach the field without a site visit

The problem behind this

A manufacturer portal the customer cannot develop further is not an advantage, it is a dependency with an invoice attached. Whoever wants to change their HMI writes a ticket, waits for a quote, then waits for a slot.

Two ways, one result

The online designer is the route without programming, meant for product management and service. Arrange widgets from the catalogue, bind data points, done.

HVACStudio is the code first route for engineering teams at the manufacturer, for sinnograte and for partners.

Both produce the same artefact, which is stored in HVACloud and distributed from there onto the devices. You can switch between them at any time: what began in the designer can be taken further in the studio and the other way round.

Built once, identical everywhere

The interface runs in step on the touch panel, in the browser and in the mobile app. You do not build it three times.

Changes go into the field as over the air updates, with nobody driving out.

Commissioning us is still an option

Anyone who prefers to order the work still can. sinnograte or a partner build on the same basis. The difference is that you are not stuck afterwards: what was ordered, you can develop further yourself.

This is what it looks like

What goes into the field

Artefacts per type, with approval levels, mandatory signing and a watch period. Changes go to the devices over the air.

The rollout rules: per artefact type the number of approvals, whether tenants may upload themselves, whether signing is mandatory and how long the client is watched.

Better shown than read

We will show you this area on a real plant, set up around the equipment you build.

Request a demo